Laserfiche WebLink
Site Reclamation Activity <br />April 2002 - March 2003 <br />Page 6 <br />Activity at the remainder of the site for 2002 consisted of; <br />1) monitoring and maintenance. <br />Activity planned for 2003 includes; <br />1) removal of the tailings located along the banks of the Animas <br />River. <br />2) Straightening and lining of the stormwater diversion ditch <br />passing through the area. <br />BULKHEADS - TR-14 / TR-i6 / TR-22 / TR-23 / TR-25 <br />Activity on this project during the 2002 reporting year consisted <br />of ; <br />1) the continuation of the seep, spring and flowing adit <br />inventory required by TR-14. Twenty percent of the sites were <br />required to be sampled and all sites monitored for field <br />parameters twice. SGC monitored each site twice (if flow <br />existed) and sampled more than twenty percent of the sites <br />during the field season. Summary sheets of the data collected <br />are included in Appendix B. <br />2) construction of the #3 American Tunnel Bulkhead. <br />Planned activity for 2003 includes; <br />1) reclamation of the American Tunnel portal area. <br />