Laserfiche WebLink
v • I~IIIIIIIIIIIIIIIII • <br />•- STERLING READY-MIX CONCRETE CO. <br />STERLING. COLORADO 80'751 <br />' February 12, 1987 <br />RECEIVED <br />Mr. Mark Loye FEB 1915187 <br />Mined Land Reclamation Board MINED LAND <br />~ 1313 Sherman Street Suite 423 RECLAMATION DIVISION <br />Denver, Colorado 80203 <br />Mr. Loye, <br />Re: Annual Report, Sterling Ready-Mix Concrete Co., Inc., <br />Riverside Pit MLR No. 76-56 <br />Our files indicate that the anniversary date for this permit <br />is February 22, 1985. Mining continued in Stage I as outlined in <br />the approved mining and reclamation plan. <br />We will deal specifically with each of the Annu~sl Report <br />questions as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 <br />(1) Mining continued in Stage I this year on land previously <br />stripped of topsoil. We mined to total depth on the 0.75 <br />acres ± shown on the annual report map for 1986 (li.te-blue). <br />The area colored dark blue has been mined to total depth <br />since mining commenced in 1976. Please refer to the annual <br />report map for the location of the area mine this year. <br />(2) No reclamation was required this year. <br />(3) We partially back-filled 0.10 acres ± of the excavated area in <br />the northeast corner of Stage I (brown) <br />(4) None this year, we continued to monitor the tree planting done <br />to date and trimmed and shaped the trees as needed. <br />(5) Not applicable. <br />(6) Not applicable. <br />(7) Mining will continue in Stage I. We expect to mine 1.02 acres <br />+ in lands disturbed previously (yellow). Processing will <br />oc ntinue in Stage IV next year as approved in the 1983 Technical <br />Revision. Backfilling will continue in Stage I. <br />a/zel~~ <br />9n. ~ <br />(~ ~~ <br />