Laserfiche WebLink
West Elk Mine Facilities <br />Location Acreaee Sa. Ft. <br /> <br />14. Topsoil Stockpile #5 0.92 40,000 <br />I5. Water Tank Topsoil Pile I.I S 50,000 <br />16. ROM Stockpile Outslopes 0.80 35,000 <br />17. Material Storage Bench Cut-slope I.50 65,340 <br />I8. C-I Conveyor Bent-lee Areas I.00 43.560 <br />West Elk Mine Facilities Sub-total 5.37 233,900 <br />Grand total (Sylvester Culch and West Elk Mine) 12.44 541,800 <br />Page 2 of 2 <br />