Laserfiche WebLink
Figure 10. Total Degree-days, Jan. to June (1986 to 1996) <br />Seneca II and II-W Mines, SCC - 1997 <br />7,600 <br />7,400 <br />7,200 <br />7,000 <br />N <br />T <br />N <br />d <br />• <br />~ 6,600 <br />O <br />m <br />.. <br />O <br />F <br />6,600 <br />6,400 <br />6, 200 <br />. 6, 000 <br />1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 <br />Total Degree days tAverage <br />37 <br />