Laserfiche WebLink
<br />i <br />(e) Hydroseeding with the approved permanent seed mix was performed on the <br />following areas: <br />Dates of Planting- November 30, 1993 to December 13, 1993 <br />Phase III-Topsoil Relocation <br />Phasc I[I- Small Area Exemption- Laydown area <br />Lower Refuse Pile- Northwest Comer <br />Roads (Rights-of--Ways) <br />French Drains <br />Berm from the Screening Plant to the Lower Access Road <br />Berm north of stack tubes <br />Date of Planting -October 1993 <br />Brush-crush Power line relocation <br />Total <br />2.04 acres 3.0`~ <br />0.29 acre ° ~°' <br />l .6l acres r V I <br />1.50 acres i 50 <br />1.10 acres ~ , 1 D <br />0.20 acre <br />0.10 acre <br />6.84 acres <br />3.00 acres <br />9.84 acres <br />The Raven Gulch exploration road segment was reclaimed after last year's exploration and the <br />reclamation will either be inspected with the other roads for bond release this summer or will be <br />re-disturbed, depending on Mountain Coal Company's exploration plans (yet to be determined for <br />1994). <br />Please notify me if you have any questions regarding this reclamation report. <br />Sin ~1~~"„ ' - <br />`~/ <br />my A. ~be <br />Environm ntal Coordinator <br />HAB/hab <br />xc: K. Welt <br />File ADM-440.3 <br />anlrecrp.doc <br />