Laserfiche WebLink
SET: No.5 REBAR 8 <br />PL.S. A% <br />N­1( F n 1,1 n0 l 1111 oqRl aC o besed <br />ni Me silt,Aetec, <br />R= I T1 .ry y be ed <br />,e„,. <br />LOT 10 <br />I <br />SET: No 5 REBAR 8 PLAS. CAP <br />/PLS. 24303 <br />LOT 9 <br />LOT 8 <br />NORTH LINE OF SOUTH I/2 OF <br />I i III <br />I � I <br />I � + <br />1/2 OF SEC. 25 <br />O i` \ <br />PROJECT BOU DARY / <br />/ I <br />I <br />I <br />FENCE LINE <br />FOR <br />— V�BED — 70 99 <br />r — 1S1 r <br />T <br />s ' —M L \� - --s -- i - -G <br />N rFi <br />0 - - -�0 <br />' .. . <br />CARMICHAEL ... <br />rte BASIN DITCH <br />N.E. 1/4 OF S.E. 1/4 <br />SET No.5 I <br />PLAS. <br />PL.S. <br />\. <br />LOT 15 \ <br />CARMICHAEL SURVEYING, INC. <br />19351 Hwy 82 IN EL JEBEL <br />P.O. BOX 1367 <br />CARBONDALL, CO 61623 <br />303 -963 -0757 <br />SEC _25 <br />E—Co 36 <br />SET: No.5 REBAR <br />PLAS CAP. <br />PL.S. 24301 <br />C <br />I <br />I <br />L_— <br />LOT 16 <br />1 <br />I <br />—QUIT CLAIM DEED DOCUMENT NO. 288920 <br />600K 5169 PAGE 3S3 <br />I <br />NORTH <br />0 100 200 400 600 BDO FEET <br />SCALE: I "= 200' <br />NOTES: <br />I. BEARINGS USED HEREON ARE BASED ON FOUND MONUMENTS ALONG _ <br />TIIE SOUTH LINE OF SECTION 30, TOWNSHIP 7 SOUTH, RANGE <br />87 WEST OF THE 6TH P.M. AS SHOWN <br />Nil NING PHASES AND OTHER INFORMATION ARE FROM A DRAWING <br />BY JEROME F. GAMBA, DATED JULY 13, 1981, LABELED EXIIIBIT <br />THREE, BLUE PIT <br />PROPERTY DESCRIPTION- PROJECT SITE. <br />THE FOLLOWING DESCRIBED <br />LANDS <br />I <br />n <br />�o <br />THOSE PORTIONS <br />OF LOTS <br />� I <br />8, 9, <br />10, 15, <br />I <br />NORTH <br />0 100 200 400 600 BDO FEET <br />SCALE: I "= 200' <br />NOTES: <br />I. BEARINGS USED HEREON ARE BASED ON FOUND MONUMENTS ALONG _ <br />TIIE SOUTH LINE OF SECTION 30, TOWNSHIP 7 SOUTH, RANGE <br />87 WEST OF THE 6TH P.M. AS SHOWN <br />Nil NING PHASES AND OTHER INFORMATION ARE FROM A DRAWING <br />BY JEROME F. GAMBA, DATED JULY 13, 1981, LABELED EXIIIBIT <br />THREE, BLUE PIT <br />PROPERTY DESCRIPTION- PROJECT SITE. <br />THE FOLLOWING DESCRIBED <br />LANDS <br />IN SECTION 25, <br />T7S., R.88W. <br />OPM <br />THOSE PORTIONS <br />OF LOTS <br />8, 9, <br />10, 15, <br />AND 16 <br />OF SECTION 25 <br />LYING <br />IN THE <br />SOUTH <br />1/2 OF <br />THE <br />SOUTH <br />1/2 OF <br />SECTION <br />25, EXCEPTING <br />ANY <br />PART OF <br />SAID <br />LOTS LYING <br />WITHIN <br />THE. PARCEL <br />OF <br />LAND DESCRIBED <br />IN <br />THE QUIT <br />CLAIM DEED <br />DOCUMENT <br />NUMBER 288920, <br />BOOK 516, PAGE <br />393. <br />ALSO EXCEPTING <br />ANY PART <br />OF SAID <br />LOTS <br />LYING <br />SOUTHERLY OF A <br />LINE <br />DESCRIBED <br />AS FOLLOWS: <br />BEGINNING <br />AT A POINT <br />(A) <br />WHENCE <br />THE SOUTHEAST <br />CORNER OF SAID <br />SECTION <br />25 <br />BEARS S. <br />15 037'16" <br />E. 689.73 <br />FEET, <br />THENCE ALONG <br />SAIU <br />LINES. <br />86 <br />°41'10" W. <br />222.04 <br />FEET <br />TO POINT (B); <br />THENCE <br />S. <br />77 049'15" <br />W. <br />241.15 <br />FEET TO <br />POINT <br />(C); <br />THENCE <br />S. <br />58 °35'39" <br />C. <br />196.83 <br />FEET TO <br />POINT <br />(D); <br />THENCE <br />S. <br />82 °47'16" <br />W. <br />139.84 <br />FEET TO <br />POINT <br />(E) ; <br />THENCE <br />S. <br />66 027'16" <br />W. <br />160.91 <br />FEET TO <br />POINT <br />(F); <br />THENCE <br />S. <br />84 °17'51" <br />W. <br />142.83 <br />FRET TO <br />POINT <br />(G); <br />'111ENCD <br />S. <br />89 °18'48" <br />W. <br />234.26 <br />FEET TO <br />POINT <br />(H); <br />TIIENCE <br />N. <br />83 041'39" <br />W. <br />212.85 <br />FEET TO <br />POINT <br />(I); <br />THENCE <br />N. <br />83 025'13" <br />W. <br />201.00 <br />FEET TO <br />POINT <br />(J); <br />TIIENCE <br />N. <br />890 21' 34" <br />W. <br />275.22 <br />FEET TO <br />POINT <br />(K); <br />TIIENCE <br />S. <br />83 012109" <br />W. <br />277.76 <br />FEET TO <br />POINT <br />(L); <br />I]IENC11 <br />S. <br />86 °49'41" <br />W.. <br />152.50 <br />FEET TO <br />POINT <br />(M); <br />THENCE <br />S. <br />82 °33'44" <br />W. <br />92.10 <br />FEET TO <br />POINT <br />(N); <br />THENCE <br />S. <br />64 002'54" <br />W. <br />51.85 <br />FEET TO <br />POINT <br />(0); <br />'T'HEN'CE <br />N. <br />86 053'54" <br />W. <br />202.60 <br />FEET TO <br />POINT <br />(P); <br />TIIENCE <br />N. <br />89 017'53" <br />W. <br />158.11 <br />FEET TO <br />POINT <br />(Q); <br />THE NCIl <br />N. <br />760 53' 30" <br />W. <br />116.89 <br />FEET TO <br />POINT <br />(R) ; <br />1111,NLE <br />N <br />86 °56'30" <br />W. <br />12 09 <br />FELT TO <br />POINT <br />(S)' <br />H NCE <br />N. <br />88 °53'S9" <br />W. <br />168 53 <br />FELT TO <br />POINT <br />('I'); <br />T'TIGNCI' <br />N. <br />86° 13' 30" <br />W. <br />188.50 <br />FEET TO <br />POINT <br />(U) ; WHICH IS <br />THE <br />END POINT <br />ON SAID LINE. <br />C.G£° WE. I - BASIS OF BEARINGS <br />S.E. CMNER SEC. 25 <br />T.TS.,R.GCk. <br />r(XJND: B.L.V. ALUM. CAP <br />SURVEYOR'S CERT'IPICA11 <br />I HEREBY CERTIFY THAT <br />FOR MINING" IS BASED <br />TION ON MAY 27, 1993. <br />ARE FROM A DRAWING BY <br />JUNE 6, 1981, LABELED <br />FIELD VERIFIED. THIS <br />CARMICHAEL SURVEYING, <br />DATE: JUNE 7, 1993 <br />C <br />1t:,ITRESS CORNER TO S.E. CORNER SEC. 30 <br />T. 7 S., R.6T li;. <br />FOUNDt STORE <br />THE AREA SHOWN 111.ItLON AS "DISTURBED <br />)N A SURVEY PFRFOI',NED UNDER MY DIREC- <br />THE PROJECT B011'1)ARIES SHOWN HEREON <br />JEROME F. GAMIiA, I'.I!. -L.S., DATED <br />EXHIBIT ONE, FLUI I'I'I, AND WERE NOT <br />IS NOT A SURVEY 1I.AT. <br />INC. <br />By <br />0 <br />Surm -yed 5 -27 -93 ReViSk"S SET <br />PRO BOUNDARY CORNER OCT, 'I11W U151 UHt7tLJ ARtA— tILUt F'I 1 <br />r PROJECT <br />rifted 6 -8 -93 1993 WESTERN SLOPE AGGREGATE, INC. <br />PFrF--I \ /FD <br />NOV 2 G 1993 <br />/WC11 ?.o <br />M -81 -907 <br />11 -m E.-► <br />Cbefy ROBERTS <br />�I��fJIq��Rl�Allllll <br />_007601 <br />