Laserfiche WebLink
Maybell Mine Annual Report <br />2002-2003 <br />No mining or excavation occurred at the property during the past year. <br />RECEIVED <br />JUL 0 2 2003 <br />Division e(Minerals and Geolo'y <br />At this time, construction activity is scheduled for next year. Umetco expects to borrow <br />approximately 35,500 cubic yards of material from the site during the 2004 or 2005 <br />construction season. <br />A map is not enclosed because there has been no activity at the site since the last map <br />update. <br />