Laserfiche WebLink
2.2 Hydrologic Monitoring Schedule <br />Station Frequency Elevation L c i n Water Type <br />H-1 Note I 6100 Hubbard Creek Surface Water <br />H-10 Note 2 6376 Hubbard Creek Ground Water <br />B-6 Note 2 6782 Bear Creek Ground Water <br />S-l Note 5 6080 Sanborn Creek Surface Water <br />S-2 Note 5 6030 Sanborn Creek Surface Water <br />P-1 Note 5 6057 Portal Dorp Inlet Surface Water <br />U-1 Note 5 6090 Unnamed Drainage Surface Water <br />C-1 Note 5 6070 Coal Gulch Surface Water <br />NF-1 Note 4 6080 Gunnison River Surface Water <br />NF-2 Note 4 6010 Gunnison River Surface Water <br />NF-3 No[e 4 5910 Gunnison River Surface Water <br />SC-1 Note 3 6106.1 Drillhole Ground Water <br />SC-2 Note 3 6227.8 Drillhole Ground Water <br />SC-3 Note 3 6227.8 Drillhole Ground Water <br />SP-1-6 Note 6 8000-8200 Spring Surface Water <br />SP-7-11 Note 7 6100-6200 Spring Surface Water <br />AG-1 Note 5 6185 "A" Gulch Surface Water <br />BG-l Note 5 6200 "B" Gulch Surface Water <br />• CG-1 Note 5 6190 "C" Gulch Surface Water <br />HN-l Note 5 6200 Hawksnest Creek Surface Water <br />HG-I Note 5 6200 Hoopla Gulch Surface Water <br />BC-1 Note 5 6240 Bardine Canyon Surface Water <br />T-1 Note 5 6220 Thompson Creek Surface Water <br />WSC DH-12 Note 8 7553 Coal Gulch Ground Water <br />Outfal] 011 Note 9 6060 Sanborn Creek Ground Water <br />TC-1 Note 3 6220 Drillhole Ground Water <br />TC-2 Note 3 6220 Drillhole G~und Water <br />NOTES: <br />1. April, June, August & October field pazameters, full suite April & October. <br />2. April Field parameters, October field parameters & full suite. <br />3. Quarterly field parameters, semi-annual full suite. <br />4. Quarterly field parameters and full suite. <br />5. Monthly field parameters, quarterly full suite. <br />6. Monthly field parameters Apri( through October through June 1994 then re-commence <br />one year prior to and continue two years after retreat mining. <br />7. Monthly field parameters through June 1994. monthly flow thereafter. Re-commence <br />monthly field parameters one year prior to and continue two years after retreat mining. <br />8. Annually in June field parameters and full suite. <br />9. NPDES requirements with flow meter, quarterly full suite. <br />• <br />7 <br />