Laserfiche WebLink
<br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1311 Sherman 51.. Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX. p031 83 281 06 <br />May l6, 2000 <br />Mr. Michael Reefer <br />CAMAS Colorado, Inc. <br />3605 S. Teller S[. <br />IIIIIIIIIIIIIIIIIII OF COLORADO <br />Lakewood, CO 80235 <br />RE: Reporting Requirements, Stegner Farms Pit (Permit No. M-99-021) <br />and Cooley Reservoir and Fulton Wildlife Area (Permit No. M-99-034) <br />Dear Mr. Reefer: <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Ezecuhve D~reC10! <br />Michael R. Lang <br />Divhlan Director <br />On May 3, 2000 the Division of Minerals and Geology (DMG) met with personnel from the State Engineer's <br />Office and Rocky Mountain Consultants to discuss policies and procedures For regulating lined gravel pits. <br />During this meeting, the reporting requirements for slurry wall installation at the Stegner Farms Pit and Cooley <br />Reservoir and Fulton Wildlife Area were also discussed. CAMAS is currently required to provide construction <br />progress reports every two weeks. As you can see in the attached DMG policy memo, we are standardiring the <br />reporting requirements and will now require only a final construction observation repoR to be submitted <br />following the completion of the facility. <br />If you would like to take advantage of the less rigorous reporting requirement for Cooley Reservoir and Stegner <br />Farms, you may submit a technical revision application for each of the two permits to do so. The DMG will <br />waive the usual technical revision fee in this case. In order to approve the revisions and permit a single final <br />report on slurry wall construction, CAMAS must comply with the other criteria from the attached policy memo. <br />[n particular, the technical revision applications must include a commitment that approved plans and <br />specifications will not be altered without prior DMG consent. <br />If you choose to apply for the technical revisions, please include a note with the applications stating that the <br />Minerals Program Supervisor has waived the fee requirement. Otherwise the applications may be rejected in the <br />initial processing step. If you have any questions, please contact me. <br />Sincerely, <br />Christina Kamnikaz <br />Environmental Protection Specialist <br />enclosure(s) <br />cc: Bazb Btunk, Rocky Mountain Consultants (w/enclosures) <br />m:\min\cl k\reporti ng.d« <br />