My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-17_REPORT - M2002020
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2002020
>
2006-05-17_REPORT - M2002020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:40:47 AM
Creation date
11/27/2007 9:57:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002020
IBM Index Class Name
Report
Doc Date
5/17/2006
Doc Name
Annual Fee/Report/Map
From
City of Greeley
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINED LAND RECLAMATION ANNUAL REPORT <br />Date: May 16, 2006 Cf~~~d~~® <br />Pemut Number: M-2002-020 11''iS ~s <br />Operation Name:25iyAvenueS~e MAC r~ <br />Pemuttee: Ci ofGreele <br />Division o/ Minerah end Deotapr <br />1. Extent of current disturbances. <br />There were no disturbances in 2005. (see attached map from the 2005 annual report). <br />2. Reclamation accomplished to date and during preceding year. <br />The reclaimed end use for the area under the mining permit is water storage. The reclamation <br />accomplished to date revolved around the construction of the slurry wall (completed in 2002) and inlet <br />and outlet facilities needed to operate the storage facility (completed in 2005). In 2003, Greeley's 25a' <br />Ave. gravel lake storage project met the Colorado State Engineer's Office performance standazd for lined <br />gravel pits. After meeting this standard for lined reservoirs, Greeley initiated and substantially completed <br />the inlet and outlet facilities for the storage facility irr 2004. Greeley began removal of tamarisk. from the <br />slide slopes in 2005. <br />3. New disturbances anticipated to occur during upcoming year. <br />LaFazge completed mining the berm between the lakes in 2004 and opted to discontinue removing <br />material below the present bottom of the existing lake(s). The disturbed slopes were reclaimed per the <br />Reclamation Plan. There aze no planned disturbances for 2006. <br />4. Reclamation to be performed during upcoming year. <br />The eastern portion of the site will be graded and debris will be removed in 2006. <br />5. Dates for the beginning of active operations. <br />Active mining began at the site in December of 2003. <br />6. Date active operation ceased for the year, if any. <br />December 2004. <br />
The URL can be used to link to this page
Your browser does not support the video tag.