Laserfiche WebLink
r <br />i <br />~I: $t SYNDICATE'MILLSITE ~ • ) <br />BOND REEVALUATION <br />Assumption used in thi calculation: Valuable may <br />equipment will be remov d. Everything else - the <br />stockpile, open trenches old machinery etc. may 1 <br />tailings disposal areas. The millsite building a <br />be contaminated with oils leachates, etc., whicty <br />than possible on the millsite. / <br />1 <br />OLD <br />Estimate a 40 x 40 Ft. builds g. Two peoplg <br />building and burn up what can be burned. 'Ph <br />landfill (1 day for 2 people d a 1 ton ru <br />cost: Wage grade crew of 2 @ $ 80/day <br />Move on D-6 cat <br />2 hrs cat work @ $51.77/h <br />vehicle and mileage - 200 ryile x .25 <br />misc. supplies \ <br />total: <br />2. DISPOSE OF <br />Estimate a substantial pile of <br />disposal. <br />cost: move on loader <br />loader 8 hrs @ 34.70 <br />truck (10-12 CY) 24 <br />total: <br />3. DISMANTLE WATER LI <br />Dismantle above ground <br />machinery, etc. <br />cost: wage grade c <br />mileage, mss <br />lowboy with <br />total: <br />hin sy such as the milling <br />mi}~ building, tailings, ore <br />e/left on the millsite and <br />surrounding area may also <br />will need to be buried deeper <br />and a cat 1 day to knock down the <br />rest needs to be trucked to a <br />k). <br />$360 <br />336 <br />104 <br />50 <br />25 <br />$875 <br />and some ore could be left For <br />of water <br />@ 180/day: 2 days <br />supplies <br />ctor 6 hrs @ 58.41/hr <br />$273 <br />278 <br />1,053 <br />$1,604 <br />, cleanup area of trash, old <br />$360 <br />100 <br />350 <br />$810 <br />