My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43429
DRMS
>
Back File Migration
>
Report
>
REP43429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:37 AM
Creation date
11/27/2007 9:54:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
10/8/2004
Doc Name
3rd Quarter 2004 Wastepile Refuse Disposal Area Inspection
From
J.E. Stover & Associates
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 3rd Quarter 2004 <br />On September 16, 2004, I performed the required quarterly visual inspection of the <br />Cameo Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. <br />The south under drain was dry. The entire pile was dry including the terraces. No <br />seepage was noted around the pile. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The northwest and southeast collection ditches were clear. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DMG. o~®Q°~ ~~~~ <br />~®~POeo caoae ~fp~ <br />Recommended maintenance: None oQ`°e°~s ~ s;~°~~ea <br />~a eg E. love D,~Q Date <br />P,~~~6° 19230 v`a.®' <br />s'~eFFS°°°eocoeee°G\a8 <br />'~:~Oy,yl E~s° <br />4rcOQp <br />
The URL can be used to link to this page
Your browser does not support the video tag.