My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43324
DRMS
>
Back File Migration
>
Report
>
REP43324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:28 AM
Creation date
11/27/2007 9:52:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
12/10/2001
Doc Name
CONCEPTUAL EVALUATION OF SYLVESTER GULCH ROADWAY CONSTRUCTION FEASIBILTY
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the position and elevation of drainage and topographic features and a program of soil testing to <br />identify soil conditions, depth to groundwater and bedrock, and soil strength pazameters. This <br />information will enable us to refine the roadway alignment and profile, design drainage <br />improvements and structures, evaluate slope stability and design retaining structures where <br />needed, develop an appropriate roadway section, and compile the associated details needed to <br />complete roadway construction. An outline of additional data needs is contained in Appendix B. <br />Estimated Cost <br />Cost estimates have been compiled to provide a framework for assessing project feasibility. The <br />estimates were based on a 12-foot-wide road using two approaches. The first approach was to <br />estimate the cost of the roadway construction under the most favorable circumstances. That is, it <br />is based solely on the cost of embankment construction and placement of an aggregate base <br />course. This produced a unit construction cost of $46.49 per linear foot of roadway and a total <br />project cost of $268,500. The second approach was to include additional allowances for <br />embankment stabilization, retaining wall construction with and without soil nails, culvert <br />installation, stabilization of the creek channel, construction of guardrails, and revegetation of <br />disturbed ground. This estimate is intended to establish an upper limit of construction cost which <br />may be encountered in a worst case scenario. This worst case unit cost was found to be $201.46 <br />per linear foot with a total project cost of $1,163,625. <br />A complete listing of the components of the cost estimates is included in Appendix C. These <br />cost estimates can be refined if detailed survey and soil testing is undertaken. <br />Respectfully Submitted S E. G ~1~ <br />... <br />No~v~ember 28, 2001 ~or~P •~; rc~; ~~ <br />o1-C~-s--~ ~ ti , Pc. cj <br />t J <br />A~ ,4 <br />Thomas E. Grieoentroe .~~ .~~~; <br />Sylvester Gulch Road Feasibility, Preliminary Report <br />Job No. OI-345 <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.