Laserfiche WebLink
TABLE 1 <br />FOIDEL CREEK MINE <br />RECLAMATION SUMMARY <br />AREA DISTURBED ACREAGE STA7U5 <br />Fish Creek Borehole 3.5 (w/road) ACI7.VE <br />Sandstones Substation 1.0 IDLE <br />Fish Creek Tipple 13.5 IDLE <br />Surface Facilities 318.3 ACPIVE <br />Drill Pads <1.5 RTY'f ATM <br />Wasterock Pile PROPOSED Pending <br />TOTAL 337.8 <br />These acreage values are based upon the revised figures found in <br />PR-02 (Southwest Mining District), and reflect the inclusion of the <br />connecting road allowing access to the railroad spur near Pond A, <br />along with additional redisturbance of areas around Pond F. <br />1992 Reclamation <br />---------------- <br />During 1992, no reclamation other than the additional <br />waterline activity in the area of Pond F was conducted <br />(approximately 4.2 acres of re-disturbance). These waterline <br />corridors were re-topsoiled and re-seeded (broadcast) in accordance <br />with the approved plan. <br />In the area of the Fish Creek Borehole, topsoil was windrowed <br />in the area of the wellheads to allow establishment of a drillpad <br />and access corridor for the year-round maintenance of the de- <br />watering wells. Topsoil was seeded using the approved pastureland <br />seed mixture for stabilization. In addition, limited supplemental <br />seeding was conducted on TCC topsoil stockpiles to ensure proper <br />cover. <br />