Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 26 <br />Client: Bower Brothers Construction <br />Work Pertormed: <br />Date: 8/20/97 <br />Time: 4.0 <br />Mileage: 40 <br />EngrJTech: JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 106 through 114 on the <br />materials placed. <br />Bower Brothers' crews placed and compacted processed waste coal in Area #1 and Area #2 of the waste pile. We <br />obtained samples from each test site and returned them to our laboratory for moisture content determination. <br />Remarks: <br />The material tested generally met with project specifications. Compaction ranged from 94% to 100% and moisture <br />contents ranged from 1.3% below to 4.7% above optimum. <br />Please refer to the attached sheet for the results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was informed of today's test results. <br />