My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43173
DRMS
>
Back File Migration
>
Report
>
REP43173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:15 AM
Creation date
11/27/2007 9:49:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Report
Doc Date
6/11/1999
Doc Name
WELL ABANDONMENT REPORT PN C-81-034
From
MINREC INC
To
DMG
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RED CANYON MINE <br />DRILL HOLE RECLAMATION DATA <br />Reclamation of monitoring wells A-1, A-2, E-1 and R-3 began on June 2, 1999 and was <br />completed on June 5, 1999. Approximately 13 hours were spent sealing remaining 4 <br />wells. Wells developed into formation and all of the mine site wells were first sealed with <br />bentonite chips. These chips came in 50 lb. bags under the name of "Pure Gold" and were <br />designed specifically for the ground water monitoring industry. For shallow the well the <br />bentonite was poured into hole until it reached approximately 10' from the ground level <br />and on the deeper well a volume to include the perforated zone plus 20' was calculated <br />and poured in the hole. The portion of the pipe between the bentonite and approximately <br />10' below the surface on the deeper formation well and the entire pipe below 10' on the <br />alluvial wells was filled with sand from a local gravel pit. The original cuttings had long <br />been spread and incorporated in the surrounding soils. A mix of approximately 50% <br />portland type 2 cement, 50% sand and water was used to seal the top of all of the wells. <br />A hole was dug azound the pipe and the concrete surface seal was broken off. The pipe <br />was cut or broken off at that level. No location references were left in place. <br />• A-I - 6/5/99 filled with sand to 11' below grade, cemented 11 - 0.5', cut off 0.5' <br />below grade. <br />• A-2 - 6!5/99 filled with sand to 7' below grade, cemented 7 - 0.5' below grade, cut off <br />at 0.5' below grade. <br />• R-3 - 6/2/99 filled with bentonite to 8' below grade, cemented 8 - 1.6' below grade, <br />cut off at 1.6' below grade. <br />• E-1 - 612199 filled with 8.5 bags of bentonite (approx.0.67 cf/bag). 6/3/99 filled with <br />sand to 7' below grade, cemented 7 - 2.4' below grade, cut off at 2.4' below grade. <br />Prepared by Larry M. Reschke,PE, 618/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.