My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43116
DRMS
>
Back File Migration
>
Report
>
REP43116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:11 AM
Creation date
11/27/2007 9:48:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Quality Control Data
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Con <br />Bayshore Ponds Slurry Wall Project <br />Weld County, Colorado <br />• <br />• <br />LABORATORY RESULTS <br />Attacb Co ' otResolts from Lab <br /> <br /> <br />SAMPLE # <br /> <br />Station <br /> <br />Date Co1leMed <br /> <br />T <br /> <br />Lab <br />Date of <br />Results ffYDRAULIC <br />CONDUCTIVITY <br />cm/s <br />% Psssing <br />#200 <br />UCS <br />~ <br />POS-003-O1 8+00 10/18/06 S-B ATT 11/28/07 2.8E-08 20.3% <br />POS-003-02 12+00 10/27/06 S-B 11/30/07 7.6E-08 25.0% <br />POS-003-03 28+Op 11/10/06 S-B 12/1/07 5.2E-08 41.6% <br />POS-003-04 32+00 ll/14/06 S-B 12/6/07 2.4E-08 38.0% <br />POS-003-OS 35+80 11/16/06 S-B 12/1/07 3.6E-08 28.0% <br />POS-003-06 40+60 11/18/06 S-B 12/1/07 3.4E-08 29.4% <br />POS-003-07 12+80 10/21/06 S-C-B 12/15/07 1.4E-07 31.7 <br />POS-003-08 2+30 11/9/06 S-C-B 12/18/07 3.0E-07 8.9 <br />POS-003-09 44+00 11/20/06 S-B 12/15/07 6.1E-08 29.1% <br />POS-003-]0 48+SO !]/28/06 S-B 12/15/07 4,0E-08 34.8% <br />POS-003-I1 222+00 12/3/06 S-B 12/18/07 2.8E-OS 44.1% <br />POS•003-12 117+90 12/5/06 S-B 12/19/07 1,3E-07 72.1% <br />POS-003-13 113+$0 12/7/06 S-B 12/28/07 4,1E-08 49.0% <br />POS-003-14 52+20 12/6/06 S-B 12/26/07 6,7E-08 34.6% <br />POS-003-15 109+70 12/8/06 S-B 12/28/07 3.0E-08 S1.S% <br />POS-003-16 56+90 12/9/06 S-B 12/18!07 1.8E-08 50.1% <br />POS-003-17 106+00 12/11/06 S-B 1/3/07 1.2E-08 31.0% <br />POS-003-18 60+00 12/12/06 S-B 1/2/07 3.7E-08 54.0% <br />POS-003-19 t01+q0 12/13/06 S-B 1/15/07 6.7E-08 77.0% <br />POS-003-20 68+$0 12/15/06 S-B 1/16/07 4.4E-08 59.5% <br />POS-003-21 96+00 12/IS/06 S-B 1/15/07 5.7E-08 79.8% <br />POS-003-22 70+90 12/IS/06 S-B 1/18/07 1.6E-OS 54.3% <br />POS-003-23 90+00 12/19/06 S-B 1/16/07 5.5E-08 82.2% <br />POS-003-24 73+20 12/19/06 S-B ]/1S/07 4.9E-OS 62.2% <br />POS-003-25 8S+$0 1/4/07 S-B 1/2S/07 8.4E-08 68.0% <br />POS-003-26 78+40 115/07 S-B 1/19/07 6.9E-08 76.1% <br />POS-003-27 88+00 12/19/07 S-C-B 1/25/07 6.4E-08 3.5 <br />POS-003-28 64+00 12/13/06 S-C-B 1/19/07 1.4E-07 18.2 <br />POS-003-29 82+00 1/8/07 S-B 1/30/07 4.5E-08 79.9% <br />POS-003-30 138+00 2/6/07 S-B 2/21/07 5.7E-08 56.2% <br />POS-003-31 134+00 2/8/07 S-B 2/26/07 6.3E-OS 65.2% <br />POS-003-32 126+00 1/11/07 S-B 2/23/07 1.3E-08 34.0% <br />POS-003-33 I30f00 Z/8/07 S-B 3/1/07 1.3E-OS 49.0% <br />POS-003-34 16+00 2/23/07 S-B 3/20/07 1.3E-08 44.0% <br />POS-003-35 2Q+00 2/24/07 S-B 3/19/07 2.0E-08 34.6% <br />POS-003-36 24+00 3/1/07 S-C-B 4/5/07 2.1E-07 13.4 <br /> <br /> AVG. 6.2E-08 <br />Notes: <br />S-B -Soil-Bentonite Backfill <br />• S-C-B -Soil-Cement-Bentonite Backfill <br />
The URL can be used to link to this page
Your browser does not support the video tag.