Laserfiche WebLink
• Table 5-83 <br /> Average <br /> Average Ave. Conductivity Mass Average <br /> Location Flow Total Flo1d ~ @ 25 C Conductivity <br /> Upstream / <br /> Ward Creek 14.7 cfs 10,670 A-F 7.9 / 108 <br />' 158 <br /> ~ <br /> Downstream <br /> Ward Creek 1.72' 7.9 226 <br /> Williams <br /> Creek 7.9 160 <br /> Sample <br /> Point A 32.5 gpm 17.08 mg 8.0 334 253 <br /> Sample <br /> Point B 10.8 gpm 8.4 5324 5715 <br /> (22.5 gpm)* 11.83 mg* <br /> Sample <br /> Point C 39.5 gpm 8.4 2096 1628 <br /> (55.0 gpm)* * 28.91 mg** <br />• Sample <br /> Point D 1.54 cfs 1,114 A-F 7.8 153 142 <br /> Spring #1 15.1 gpm 7.3 738 772 <br /> Spring #2 7.3 506 <br /> Spring #3 3.8 gpm 7.3 594 596 <br /> Spring #4 33.7 gpm 7.9 603 517 <br />* Calculated partially from mine discharge. <br />** Calculated from the addition of Sample Points A and B. <br /> <br />-3- <br />