Laserfiche WebLink
Bitter Creek Annual Report <br /> Reclamation construction at Bitter Creek occurred during late 1998 and early 1999. <br /> Construction consisted of debris and structure removal, recontouring mine spoils piles <br /> and seeding. <br /> A storm event in August of 1999 caused damage to portions of the mine spoils pile. The <br /> damage is scheduled to be repaired next year. <br /> Attached is a map from the mine permit showing the disturbed area where reclamation <br /> construction occurred. Work was also conducted at adjacent pre law mine sites, <br /> including the preservation of a wooden ore bin for the Bureau of Land Management. <br />