My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42999
DRMS
>
Back File Migration
>
Report
>
REP42999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:02 AM
Creation date
11/27/2007 9:46:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
1/21/2004
Doc Name
3rd Quarter 2003 Coal Waste Inspections
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New EIk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Third Quarter 2003 <br />Primary Refuse Disposal Area (RDA} <br />September 30. 2003 <br />General Description or Reference to Site Plan: <br />The Refuse Disposal Area is located north of State Highway 12 and the Middle Fork of the <br />Purgatoire River. Refuse was transported from the preparation plant to the RDA by conveyor belt. <br />The plant has been idle since March of 1996 at which time the last refuse was placed on the <br />fill area. <br />Activity During Inspection: <br />Area was inactive thoughout the inspection. Minor maintenance was done during the quarter <br />to improve drainage patterns for directing surface run-off to the armoured down-drains. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/ <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all areas. Vegetation is well established on previously reclaimed areas. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />No fill was placed during the quarter. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.