Laserfiche WebLink
iiiiiiiiiiiiiiii;: <br />999 <br />STATE OF COLOl~DO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmem of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 D l v l s l o N o r <br />Phone: (303) 866-3567 MINERAL S <br />FA\: (303) 832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br />interoffice MINING•SAFETY <br />MEMORANDUM B'" owene <br /> Governor <br /> GceRE Walther <br />to: File C-81-O19 Colowyo Coal Mine, West Pit Fill Inspection Report, 2^" Quattft`°rive Dueuw <br />2001 <br />from: Byron G. Walker"`~ <br />subject: Review for Compliance <br />date: December 1?, 2001 <br />Rule 4.09.1(1 1) /rlspection <br />Michael B Long <br />Division Duewn <br />Rule 4.09.1(1 l)(a) The fill shall be inspected for stnbilin~ by a registered engineer or o!her <br />qualified professional specialist experienced in constnrction of earth crud rochfill emburtkntents <br />nr!d~r the direction of a qualified professional engineer at (east gturrterlyl throughout the <br />cnnstrnetion cold during the following ,^. rilicrr(tanstru~"icn periods'': (1 )removal of a!! organic <br />rruuerial and topsoil, (2)placement of mlderdrainq.~r s,rs!errs, (3) installation of surface drnirtr>?r <br />~stems•, (4) plracernent and cm. npaction of /i%t nurteriuls, cold ; S) revegetntiun. <br />The permittee is incompliance with this rule. t Thts s a quarterly report. A registered euglueer <br />accomplished both the inspection and certification. `None of the critical cons[n.lction periods <br />were encountered during the lime period of the report. <br />Rule 4.09. I (I I)(b) The qualified registered engineer shall provide to the Division a certified <br />report within 2 weeks rafter each inspectibnl that the fill has been constructed as specified in the <br />design approved by the Division. '"Tlte report shall inchrde u description of any appearances of <br />instnbiliq~, structural weakness, and other hazardous conditians observed during the hrspectior:. <br />A copy of the report shall be retrained at the mine site. <br />The action is in compliance with this rule. The inspection was accomplished on June 27, 2001. <br />The report was prepared on June 28, 2001. The inspection report was submitted to [he Division <br />under a letter of June 28, 20011, and received at the Division of June 29, 2001. '' The report <br />included observations on instability, structural weakness and other (lack of) hazardous. <br />CC: Dan Hernandez <br />files: C-81-019 West Pit Fill Reports <br />C:\WPDOCS\Colowyo\west pit spoil till report 2Q1 review.doc <br />