My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-11_REPORT - M2001051
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001051
>
2006-08-11_REPORT - M2001051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:40:47 AM
Creation date
11/27/2007 9:44:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001051
IBM Index Class Name
Report
Doc Date
8/11/2006
Doc Name
Annual Fee/Report/Map
From
Lafarge West Inc
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
otice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />- RECEl~/ED <br />Permittee Name: Lafarge West, Inc. I/++ <br />Permit No: M-2001-051 AUp ~ ~f1Z~Qs <br />Operation Name: North Taft Hill Expansion Site DIVISIonofR~G~mepon, <br />Anniversary Date: August 1, 2006 Mining and Safety <br />Total: $688.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 50 b. County where mine is located: Latimer <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? NO <br /> Does this mine operate MORE or LESS than 180 days per year? LOSS <br />3. Does this mine have a phased reclamation plan? Yes <br />9. Total acres affected during the report year:* +/_,5 <br />5. Total acres reclaimed for the report year:* +/_,5 <br />6. Total number of acres in topsoil replacement stage: +/_,5 <br /> a. Average thickness of topsoil replaced 6" <br />7. Total number of acres seeded: 0 <br /> a. List species seeded and seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: NA <br /> a. Date reclamation began: 2006 <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* NA <br />10. Estimated total acres to be affected in the next report year:* Q <br />11 . coMMENTS: Re-established bank offset from 2004 mining and reclaimed berm establishing a 3:1 slope (see <br /> mao for detail). <br />* Please show the location of the acreage for items 9-6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />*` NOTE If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: lr/L(.C) ~j7 r.~Iy p-7`-]~'~.yt ~J ~ Date 8/11/2006 <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name: EricReckentine Phone: 303-657-z/~ <br />FAX No: 303-657~<fO=~7 <br />Company: Lafarge West, Inc. <br />Address : IOtiO ~UCrh ~rnh 11~Y111 ~2fb <br />- -~~rT ~ ~L~~I <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.