Laserfiche WebLink
Jln <br />ZI- <br />O U <br />0 <br />U Z <br />z0 <br />w� <br />ZW <br />> O <br />Ow <br />Utn <br />Q <br />� U <br />O Z <br />wo <br />N Z <br />N Q <br />wQ� <br />Q� O <br />aw <br />N <br />Z� <br />Z� <br />a� <br />t] F <br />W J <br />�N <br />ww O <br />O U <br />OVERE=WATNIN CORRECIEO <br />CREATING 2HAV MD 3H:1V <br />2H:1V AND 3H[1V SLOPES DONE <br />TOPSO1= AND SEEDED. <br />EXCAVATION J <br />AREA UMI3 <br />MINED IN 1998 <br />(0.5 ACRES) <br />MINED IN 1999 <br />RECLAIMED IN 1999 <br />MINED IN 1998 <br />RECLAIMED IN 1998 <br />MINED IN 1997 <br />RECLAIMED IN 1997 <br />MINED IN 1996 <br />(BACKF"LED OVER EXCAVATION) <br />RRECLAIMED IN 1996 <br />MINED IN 1995 <br />RECLAIMED IN 1995 <br />JANUARY 1993 - JANUARY 1994 <br />0.7 ACRES MINED IN 1993 <br />1.0 ACRES ANTICIPATED TO BE MINED IN 1994 <br />0.3 ACRES RECLAIMED IN 1993 <br />0.5 ACRES ANTICIPATED TO BE RECLAIMED IN 1994 <br />JANUARY 1992 - JANUARY 1993 <br />1.5 ACRES MINED 1992 <br />1.2 ACRES ANTICIPATED TO BE MINED IN 1993 <br />0.5 ACRES RECLAIMED IN 1992 <br />0.5 ACRES ANT. TO BE RECLAIMED IN 1993 <br />RECEIVED <br />JAN 2 7 1999 <br />PRESENT GROUND <br />PROFILE PRESENT GROUND <br />PRORLE <br />TEMPORARY STEEP <br />SLOPE MATERIAL TO BE <br />EXCAVATED BEFORE <br />DAM CONSTRUCTION <br />FUTURE DAM CREST <br />(ELEVATION 8625') <br />MATERIAL TO BE <br />EXCAVATED AFTER <br />DAM CONSTRUCTION <br />TOPSOIL STOCKPILE <br />r r l�l <br />ASE II f... STOCKPILE AREA <br />PROPOSED r.... <br />l <br />I SALT <br />AREA FOR CRUSHING <br />AND WASHING EQUIPMENT AND <br />STOCKPIUNG OF MATERIAL THIS AREA NOT IN� _r <br />MINING PERMIT BOUNDARIES <br />NASxgPEUxt I // / / LEASE LINE <br />/ <br />FINAL GROUND PROFILE <br />AFTER EXCAVATION IS COMPLETE <br />CROSS- SECTION OF GUANELLA RESERVOIR_ SITE <br />- LOOKING WEST - <br />N.T.S. <br />Permit Number/ _ _ S� <br />/ Class: 0Pe0Drt <br />Section/Exhibit <br />Class: ❑ Revision.-._._._._._._._._._ ._._._._._._._._._._._._._._._- <br />THIS MAP DEPICTS CURRENT MINING <br />CONDITIONS. FOR OTHER YEARS INFORMATION, <br />PLEASE REFER TO PREVIOUS ANNUAL <br />REPORTS. <br />z (\ <br />o <br />O <br />m5 1W 0 mR Rao ea9 O <br />s <br />EE��'' <br />4gnn[nnY IQi <br />M -RUIT <br />cc:Ptrc Pr <br />