Laserfiche WebLink
<br /> <br />RECEIVED <br />FER OII 1SS9 <br />Division or muierais s i;eoiogy <br />February 04, 1999 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />January 31, 1999 - February 06, 1999 <br />Dear Mr. Dillie:~~., <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of January 31, <br />1999 - February 06, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.073 <br />ppm CN-total. The collection pond averaged 0.014 ppm CN-wad and 0.016 <br />ppm CN-total. <br />Sincerely, <br />~~ <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />