My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42681
DRMS
>
Back File Migration
>
Report
>
REP42681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:44:37 AM
Creation date
11/27/2007 9:41:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
7/23/2003
Doc Name
2nd Q 2003 Review Memo
From
BGW
To
File
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interoffice <br />MEMORANDUM <br />to: File C-81-019 Colowyo Coal Mine, West Pit Fill Inspection Report, 2nd Quarter <br />2003 <br />from: Byron G. Walker <br />subject: Review for Compliance <br />date: July 23, 2003 <br />Rule 4.09.1(11) Inspection <br />Rule 4.09.1(11)(a) The f Il shall be inspected for stability by a registered engineer or other <br />qualified professional specialist experienced in construction of earth and rockfill embankments <br />under the direction of a qualified professional engineer at least quarterly' throughout the <br />construction and during the following critical construction periods2: (1)removal of all organic <br />material and topsoil, (2)placement of underdrainage systems, (3) installation of surface drainage <br />systems, (4) placement and compaction of fill materials, and (5) revegetation. <br />The permittee is in compliance with this rule. 'This is a quarterly report. A registered engineer <br />accomplished both the inspection and certification. z Installation of surface drainage systems was <br />a critical construction period encountered during the time period of the report. <br />Rule 4.09.1(11)(b) The qualified registered engineer shall provide to the Division a certified <br />report within 2 weeks after each inspection that the fill has been constructed as specifted in the <br />design approved by the Division. ZThe report shall include a description of any appearances of <br />instability, structural weakness, and other hazardous conditions observed during the inspection. <br />A copy of the report shall be retained at the mine site. <br />The certification indicates that the fill was inspected on June 20, 2003. Thus the report was due <br />July 10, 2003. The report was dated June 25, 2003 and received at the Division on June 27, 2003. <br />z The report included (indirectly) observations on instability, structural weakness and other (lack <br />of) hazards. <br />files: C-81-019 West Pit Fill Reports <br />C:\WPDOCS\Colowyo\wp fill insp rpt 4q2 rvw.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.