My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42663
DRMS
>
Back File Migration
>
Report
>
REP42663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:44:35 AM
Creation date
11/27/2007 9:41:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987012
IBM Index Class Name
Report
Doc Date
6/1/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III III'IIIIIIIIIIII • <br />sss <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />~ei: ~~~Z~ <br />~K: z~vy~ <br />RECEIVED <br />Permittee Name: Southway Construction Company, Inc. UU N O 1 1998 <br />Permit No. M-87-012 <br />operation Name: King Pit* DivistonofMiflCf2ls&(if;Ob9Y <br />Annive rs a::y Date: May 27, 1998 <br />Total: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 88.65 b. County where mine is located: Alamosa <br />2. Has• this mine been granted TEMPORARY CESSATION STATUS? YES <br />DoE:s this mine operate MORE or LESS Chan 180 days per year? ~ ~~LE^^S~~S <br />3. Does this mine have a phased reclamation plan? YES (iy~ <br />4. Total acres affected during the report year:* 0 <br />5. Total acres reclaimed for *_he report year:* ._Q___ <br />6. Total number of acres in topsoil replacement stage: 2 <br /> a. Average thickness of topsoil replaced: a D o r o x. l f t. <br />7. To tat number of acres seeded: 0 <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: y~ e <br /> a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic mate rial or soil <br /> con~9itioners used for the report year:* None <br />10. Estimated total acres to be affected in the next report year:* 2-5 <br />11. COMMENTS: No mining or processing during reporC y ear; approx.40,000 <br /> tons sold from stockpile. Mao is unchanged from previously submitted. <br />* Please show the location of the acreage for items 4 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: "Cf there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a i~ew map is unnecessary. However, this must be stated above. <br />Signature : Date : 5- 2 7- 9 8 <br />Please ty~: r print current contact name, mailing address, and phone number below: <br />Contact Name: Jim Burchett Phone: ( 719 ) 589-5103 <br />FAx No: ( 719 ) 589-5522 <br />Company: Southway Construction Co.,Inc. <br />Address: 117 White Pine Drive <br />Alamosa, CO 81101 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.