Laserfiche WebLink
• <br /> <br /> <br />Walker to File <br />December 28, 2000 <br />Page 3 of 4 Pages <br />Tank J 3-2-99 6-11-99'' 9-14-99 10-18-99 ' <br />Tank K 10-18-99 <br />Tank L 10-18-99 <br />Tank M 10-18-99 <br />6 No date was entered on the report. The permittee has been asked (Division review letter) for the <br />s Reviewed by a registered professional engineer on 6-21-99 <br />~ Reviewed by a registered professional engineer on 4-13-99. <br />Z Reviewed by a registered professional engineer on 7-8-99. <br />s Reviewed by a registered professional engineer on 10-13-99. <br />° Reviewed by a registered professional engineer on 12-12-99. <br />information. <br />~ Reviewed by a registered professional engineer on 10-29-99. <br />$ Repair work was reported as required in the ls` Quarter inspection, and reported as <br />accomplished in the 4th Quarter inspection. <br />9 Repair work was reported as required in the 2"" Quarter inspection, and reported as <br />accomplished in the 3`d Quarter inspection. <br />Rule 4.05.13(4)(c): A hydrologic report shall be submitted to the Division annually with the date <br />of submittal determined in consultation with the permittee. The annual hydrologic report shall <br />contain at a minimum: <br />The report is in compliance with this rule. The report is to be submitted to the Division by April 1 <br />following closure of the report yeaz (Permit, page 4.05-11). The report was received in the Division <br />on Mazch 10, 2000, under a transmittal letter of Mazch 9, 2000. Water monitoring requirements aze <br />presented on pages 4.05-11 through 4.05-14 of the permit, and aze summarized on page 1 of the <br />report. There are two surface water monitoring stations on Goodspring Creek (New Upper <br />Goodspring Creek station located upstream from mining activities, and Lower Goodspring Creek <br />station located below mining activities). There is one surface water monitoring station on Taylor <br />Creek (Lower Taylor Creek below mining activities). There are two groundwater monitoring wells <br />on Goodspring Creek (North Goodspring Well located downstream of mining activities and the A6 <br />well located upstream of mining activities). There is one alluvial monitoring well (Gossard Wel]) <br />located down gradient from the Gossazd Coal Loadout facility. <br />Rule 4.05.14(4)(c)(i): Water quantity data obtained from each monitoring site during the water <br />year; <br />The report is incompliance with [his rule with [he permitted exception that water quantity data was <br />submitted by calendaz year in-lieu-of water year (Permit, page 4.05-11). Water quantity data is <br />required for surface flows at the New Upper Goodspring Creek, Lower Goodspring Creek, and <br />Lower Taylor Creek surface water monitoring sites. Water quantity data is submitted in Dischazge <br />