Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />October 2002 Monthly Report <br />Page 2 <br />tailing impoundment during the month, and seepage along Rito Seco Creek remained dry <br />throughout the month. <br />As communicated the pasty several months, calendar year 2002 reclamation activities <br />were initiated on August 29~' and completed October 30a'. Earthmoving activities <br />continued throughout October along (1) the main haulage roadway between Rito Seco <br />road and the BMR parking ditch, (2) the parking ditch, (3) the South Waste Rock Facility <br />and (4) the tank farm. Reclamation activities during the month primarily included: <br />(a) topsoil transport and spreading along the recontoured surfaces, <br />(b) fertilizer application, and <br />(c) seed application. <br />Completed reclamation activities during the calendar year 2002 field season encompassed <br />the recontouring, topsoil application, fertilization and seeding of 34 acres. All <br />reclamation activities completed during the 2002 calendar year will be presented in the <br />2002 annual report. <br />Table 1-October 2002 Depth to Water Measurements <br />Monitorin Site Date De th to Water feet <br />M-1 10/31/02 74.27 <br />M-10 10131102 25.89 <br />M-1 1 10/31/02 3 8.22 <br />M-1 1 R 10/31/02 45.41 <br />M-16 10!31102 23.04 <br />M-17 10/31/02 33.07 <br />M-18 10/31/02 27.27 <br />M-19 10!31/02 24.53 <br />M-20 10/3 ] /02 25.23 <br />M-21 10/31/02 18.44 <br />M-22 10/31/02 17.29 <br />M-23 10/31/02 45.89 <br />M-24 10/31/02 27.35 <br />M-25 10/31 /02 Dry <br />M-26 10/31 /02 ] 8.64 <br />M-27 10/31/02 Dr <br />M-28 10/31/02 25.63 <br />M-29 ] 0/31/02 27.49 <br />