My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42579
DRMS
>
Back File Migration
>
Report
>
REP42579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:44:29 AM
Creation date
11/27/2007 9:39:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
1/1/1997
Doc Name
1996 AHR
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2 Hydrologic Monitoring Schedule <br />2.05.6 (3) ro) (~) <br />Station Frequency Elevation Location Water Twe <br />H-1 Note 1 6100 Hubbazd Creek Surface Water <br />H-10 Note 2 6376 Hubbazd Creek Groundwater <br />B-6 Note 2 6782 Bear Creek Groundwater <br />S-1 Note 5 6080 Sanborn Creek Surface Water <br />S-2 Note 5 6030 Sanborn Creek Surface Water <br />P-1 Note 5 6057 Portal Drop Inlet Surface Water <br />U-1 Note 5 6090 Unnamed Drainage Surface Water <br />C-1 Note 5 6070 Coal Gulch Surface Water <br />NF-1 Note 4 6080 Gunnison River Surface Water <br />NF-2 Note 4 6010 Gunnison River Surface Water <br />SC-1 Note 3 6106.1 Drill Hole Groundwater <br />SC-2 Note 3 6227.8 Drill Hole Groundwater <br />SC-3 Note 3 6227.8 Drill Hole Groundwater <br />SP-1 - 6 Note 6 8000 - 8200 Spring Surface Water <br />SP-7 - 11 Note 7 6100 - 6200 Spring Surface Water <br />AG-I Note 5 6185 "A" Gulch Surface Water <br />BG-1 Note 5 6200 "B" Gulch Surface Water <br />• CG-1 Note 5 6190 "C" Gulch Surface Water <br />HN-1 Note 5 6200 Hawksnest Creek Surface Water <br />BC-1 Note 5 6240 Bazdine Canyon Surface Water <br />WSC DH12 Note 8 7553 Coal Gulch Groundwater <br />Outfall Ol l Note 9 6060 Sanborn Creek Groundwater <br />NOTES: <br />1. April, June, August, & October field parameters, full suite April & October <br />2. April field parameters, October field parameters & full suite <br />3. Quarterly field parameters, semi-annual full suite <br />4. Quarterly field parameters, quarterly full suite <br />5. Monthly field parameters, quarterly full suite <br />6. Monthly field parameters, April through October through June 1994 then recommence <br /> one year prior to and continue for two years after retreat mining <br />7. Monthly field parameters through June 1994, Monthly flow thereafter . Recommence <br /> one year prior to and continue for two years after retreat mining <br />8. Annually in June field parameters and full suite <br />9. NPDES requirements with flow meter, quarterly full suite <br /> Full suite analysis parameters are shown on page 2.04.39a. Field parameter include <br /> flow or water level, pH, temperature, and conductivity. <br /> Downstream Sanborn Creek (S-2) will only be monitored if upstream Sanborn Creek <br />• (S-1) has flow <br /> 2.05 -46iii Rev. 2:04-04-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.