Laserfiche WebLink
S7!'~ O" 1'C_'.7?.'., r.; :'D R_~: _'C,TIG • <br />Pit T:a~:z: East Rigden c ~, =Satn=: Flatiron Materials Co_ <br />t•:3naa°<-: Dave Edel <br />Date: 8/1/83 FL°~rting Perioc: 8/1/82-8/1/83 -- <br />A. Please provide a brief narrative of your reclamati:cm efforts in the past 12 rronths <br />Specifically we are interested in what you have and have not acczaolished in this <br />area and an explanation of the problems inwlved and the successful m.thcxis you've <br />used. <br />We have used overburden removed from the area mined last fall and <br />this spring to backfill along Boxelder Ditch on the western edge <br />of mined area. There was a large amount of heavy clay and mud <br />encountered while stripping. 'Groundwater had to be relieved with <br />an open trench to allow stripping. <br /> <br />In order to simply detail for your evaluation, please fill in the blanks belv... <br />I. 1~lining Permit Atu~ual P~:e~rt <br />Actual Sc~ ification Frojection <br />a. ~ Acres StYirr~r-d <br />Incat i ons 10 <br />Incations 10 <br />c. ~ Acres availab]e for <br />~ rr-cla-ration 4.5 <br />7r_.ations <br />