Laserfiche WebLink
ilLt rllyd. UULU SL lU~Il`!-b(L-JJbJ Ul,l 17~yJ ~~71 No.UU[ r.Vt! <br />1 <br /> <br /> <br /> <br /> DENSITY/PERMEABILITY TESTS ON LINfiR COVER <br /> PHASH ONE AND TWO <br /> SUMMARY <br /> 10-14-93 <br />' <br /> TEST' LOCATION/D&SCRIPTION COMP. PERMEABILITY <br /> X <br /> <br /> SAMPLE N0. 100 <br /> PHASE TWO, ACRE 1 <br /> 175' BAST OF MAIN fiMB. ABUTMENT 89.9 2.aX10-8(CM/S) <br />' U-8 DOZER PLACHMBNT ONLY <br /> SAMPLE N0.101 <br />' PHASE TWO, ACRE 8 <br /> 83' SOUTH OF PHASE 1/2 TIE-IN 98.1 1.9x10-6(CM/5) <br /> HEAVY HAUL TRUCE TRAFFIC <br />' SAMPLE N0. 102 <br /> PHASE ONE, ADJACENT TO ACRE 40 <br /> 2.0' NORTH OF PHASE 1/2 TIE-IN <br />HHAVY TRAFFIC AT CONSTRUCTION 100.0 1.6X10-8(CM/S) <br /> AND LIGHT TI(AFFIC DURING OPERATION <br /> SAMPLE N0. 103 <br />' PHASE ONE, ADJACENT TO ACRE 4 <br /> 100' NORTH OF PHASE 1/2 TIS-IN 95.8 2.9X10-S(CM/S} <br /> INITIAL CONSTRUCTION TRAFFIC <br /> ONLY <br /> SAMPLE NO. 104 <br />' PHASE TWO 30' Nth OF ANCHOR <br /> <br />TRENCH ACRH 5, 8-INCHES FROM _ <br />3.1X10-G(CM/~) <br /> THE SURFACfi OF AREA PUSHED <br /> BY DOZER ONLX (NO TRAFFIC) <br /> SAMPLE N0. 105 <br /> PHASE TWO 50" Nth OF ANCHOR <br />' <br />TRENCH ACRE 7, 8-INCHES FROM - <br />3.6X10-6(CM/S) <br /> THE SURFACE OF AREA PUSHHD <br /> F3Y DOZER ONLY (NO TRAFFIC) <br />' SAMPLE N0. 108 <br /> FHA5E TWO ACfiE 2 AT NORTH - 3.9X10-6)CM/S) <br />' FINAL SAMPLE LOCATION <br />