Laserfiche WebLink
0 011 �I0�1001�000001� <br /> Q6DGGJ4 �WCO Q IIpa�S, Oa6. 999 _ _._BAL OFFICES AND PLANT <br /> SAND AND GRAVEL 11521 BRIGHTON ROAD•HENDERSON,COLORAD080640 <br /> (303)289-1837 <br /> August 12, 1997 <br /> Mrs. Barbara Chiappone RECFI"FD <br /> Division of Minerals and Geology <br /> Minerals Section <br /> Sherman Street Suite 215 18 1997 <br /> Denver, Colorado 80203-2273 <br /> Dear Mrs. Chiappone: <br /> Re Albert Frei and Sons, Inc, <br /> Walstrum Mine, M.L.R. Permit <br /> No. M-83-033, Annual Report <br /> FEDERAL TAR IDO 84-0517799 <br /> Our files indicate that the anniversary date for this permit is <br /> June 23. This pit HASi80T been granted a Temporary Cessation and it <br /> HAS operated more than 180 days this year. The Financial Warranty <br /> for this operation is $75,000, the permitted area is 125.88 ac. ± and <br /> the pit is divided into 7 Reclamation Phases. A sign that conforms <br /> with rule 6.7 Signs and Markers is at the entrance to the quarry on the <br /> scale house. Please refer to the Annual Report Map for the location <br /> of areas discussed in this report. This is a quarry operation, as a <br /> result we remove large amounts of material without disturbing large <br /> areas of land. <br /> We will deal specifically with each of the Annual Report <br /> requirements as outlined in Rule 1. 15 of the Rules and Regulations, <br /> and the annual notice letter. <br /> ( 1) Mining continued on the area previously stripped in Phase I. <br /> Total disturbance to date in Stage I is 29.97 acres ±. The <br /> floor area increased by 0. 17 acres ± as the face of the mine <br /> moved into the stripped area. The current face area covers <br /> approximately 7 .27 acres ± . The floor of the mine is on three <br /> levels; the first is the level near the scale; the second is <br /> approximately 80 feet higher and the third is near the face and <br /> I another 30 feet above the second. The scale house level is <br /> the final level of the mine floor. The other two benches will <br /> be lowered as mining progresses into the property. The upper <br /> benches were left to accommodate the processing equipment so the <br /> mine would work more efficiently. <br /> (2) No reclamation was required this year. Minor amounts of <br /> \ backfill continue to be placed in the valley on the eastern side <br /> of Phase I as approved. There is a topsoil stockpile on each <br />