Laserfiche WebLink
TABLE 204.7-1 (CONT.) <br /> <br /> <br /> MONTHLY QUARTERLY SEMI- <br />ANNUALLY ANNUALLY <br />NEW HORIZON 2 MNE <br />GVµN13 (Underiwrden) Field(6) Lab(5) <br />GV~FN14 (Dakota Coal) Feld(6) Lab(s) <br />G1/µN15 (Oveat~urden) Field(6) Lab(5) <br />G1/V-N16P1 (Underburden) Field(6) Lab(5) <br />GW-N17P1 (Dakota Coal) Field(6) Lab(5) <br />G1N-N18P1 (Cverburden) Field(6) Lab(5) <br />G1N-N36 (Underburden) Field(6) Lab(5) <br />GV~N37 (Dakota Coal) Feld(6) Lab(5) <br />GVtFN38 (Overburden) Feld(6) lab(5) <br />GW-N39 (Alluvium) Field(6) Lab(5) <br />GV~N40 (Alluvium) Reld(6) Lab(5) <br />SV~N102 (NPDES 007) Feld(3) Lab(4) <br />SW-N104 (Vlfst Lateral Ditch) Field(1) Lab(5) <br />SVV-N105 (Vtkst Lateral Ditch) Field(1) Lab(5) <br />SW-N108 (Calamty Draw) Field(1) Lab(5) <br />S1/µN109 (Calamity Draw) Field(1) l.ab(5) <br />(~) measure monwy water conoucuwry, rh, temperature, nowiaeptn ror surtaoe water morntonng stanons <br />(SWs) <br />(2) Measure monthly for conductivity, PH, temperature, oil/grease, settleable solids, total suspended solids, <br />total dissolved solids, and iron for all discharging water from ponds for Outfalls 001 through 006. <br />(3) Measure weekly for ~nductivity, PH, temperature, oil/grease, settleable solids, and flow for all <br />discharging water from Outfalls 001 and 007. Test for total suspended solids, total dissolved solids, <br />and iron once a month for Outfall 001 and Qrtfall 007. <br />(4) Measure water conductivity, PH, temperature, oil/grease, settleable solids, total suspended solids, total <br />dissolved solids, and iron. Full suite laboratory analysis (February, May, August, and November on <br />quarterly sdiedule), if pond(s) are discharging for Outfalls 001 through 007. <br />(5) Measure water Conductivity, PH, temperature, oil/grease, and flow/depth. ~tiave full suite laboratory <br />analysis February and August for Semi-Annual schedule and August for Pnnual schedule) for listed <br />groundwater monitoring wells and surface monitoring stations. <br />(6) Measure monthly water depth for groundwater monitoring wells (GWs). <br />~~ (7) Measure annually water depth for groundwater, revert back to monthly if water is found. <br />(Reused a-s9s) 2.04.7-39 <br />