|
According to C.R.S. 34-32-1 It
<br />the operator shall submit a repr
<br />reclamation accomplished to d,
<br />during the upcomin;; yeaz, and
<br />a report and map to enclosed a
<br />the above elements may suffix
<br />If your operation is subject to
<br />provide with the Annual Repo
<br />1.13.7(1)(x):
<br />(I) the condition of V
<br />(ii) what specific met
<br />performance standazd
<br />approved application;
<br />(iii) plans frx resumpt
<br />Please provide the additional t
<br />(a) Per the rt;quireme
<br />regazding t}re sufficiet
<br />(I) Per the req
<br />statement reg.
<br />irrevocable le
<br />credit, and fir
<br />(ii) F'er the rec
<br />Deed of Trust
<br />independents
<br />any circumsta
<br />and the value
<br />The :report shs
<br />(iii) Per the re
<br />Irrt:vocable Le
<br />of a balance sl
<br />Lettt:r of Cred
<br />(vil Per the
<br />Priority Lien
<br />detail to fully
<br />and equipmer
<br />(b) Per the requiremen
<br />required as part of the
<br />(Please note that if yot
<br />Protection ]?Ian as pan
<br />.~ ~
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />3), and C.R.S. 34-32.5-116(3)(x), on the anniversary date o the permi[ ea~;h yeaz,
<br />t and a map showing the ex[ent of current disturbances to fected land,
<br />e and during the preceding year, new dismrbances that are ticipated to occur
<br />eclamation that will be performed during the upcoming ye .Please attach such
<br />nual report form. (An adequately labeled map that cleazly delineates and includes
<br />for a written report.)
<br />provisions of Temporary Cessation as defined in the Act ~rtd Rules, you must
<br />the following information as required by 2 CCR 407-1, 40'~-4, and Rules
<br />operation at the time of cessation;
<br />have been and will be implemented to comply with rec amation,
<br />Environmental Protection Plan requirements, if they az part of your
<br />of mining operations.
<br />information with your Annual Report, as
<br />s of 2 CCR 407-I, 407-4, and Rules 1.15(1), provide an u dated statement
<br />y of the value of the Financial Warranty, specifically:
<br />irements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(x), pro ide an updated
<br />jing the sufficiency of the value of the financial warranty. pecifically,
<br />~rs of credit, Deeds of Tntst, and security agreements, self-i surance, salvage
<br />priority liens on project related fixtures.
<br />of 2 CCR 407-1, 407-4, and Rules 1.15(I)(b), pelmets secured with a
<br />r a Security Agreement, the operator shall submit an updat , by a qualified
<br />rraiser, indicating any changes in property value, and a star ment summarizing
<br />:es which may affect the adequacy of the Deed of Trust, or Security Agreement,
<br />the property subject to either of these instruments.
<br />also provide proof that there are no past-due property raze .
<br />rirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permi secured with an
<br />er of Credit, [he operator shall have the bank provide docu~entation in the form
<br />et, certified by a Certified Public Accountant, demonstrate g that the
<br />does not exceed ten percent (10%) of the bank's capital su lus accounts.
<br />luirements of 2 CCR 407-1, 407, and Rules 4.9.3(c), pe its secured bl~ a First
<br />any fixtures and Equipment, the operator shall provide a r port in sufficient
<br />:scribe the condition, value, and location of all pledged fix , res
<br />is of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monito ng information
<br />approved permit application, to include the Environmental protection Plan.
<br />are not a Designated Mining Operation, you will not have qtr Environmental
<br />of your approved permit.)
<br />
|