Laserfiche WebLink
1 <br />• • • <br />Popejoy Construction Co., Inc. Daniel Hamill <br />Donald G. Popejoy Phone (316) 356 - 34(]4 oPERAnoNS reANAGEF <br />PRE61DENr <br />FAX (316) 358 - 4788 <br />David Kinkelaar Lakin Sand Pit <br />OFflCE MANGER P.O. Box 385 - Ulysse5s, Kansas 87880 (318) 355 - 8(136 <br />ANNUAL REPORT <br />PERMIT NO: M-86-124 <br />CECIL II GRAVEL PIT <br />REPORT: <br />This permit was transferred from Washington County to Popejoy Constsruction on January 25, <br />1995. <br />The site is located on the Arickaree River just northeast of Cope, Colorado. Popejoy <br />Construction mined a small amount of sand and gravel from the pit in 1996 for use in a nearby <br />highway project. The mined area was all located in the existing bed of the Arickaree River, and <br />the pit area was backsloped when mining was completed. <br />The permitted area is 9.9 acres. No mining or reclamation has been done during the past permit <br />year. A map of the permit is enclosed. Reclamation required is limited to minimal grading and <br />seeding of the diswbed areas on the bank of the Arickaree River. <br />We estimate a cost of approximately $5,000 to complete the minor reclamation required by the <br />permit. Since the bond security is for $7,500, it is sufficient to cover any reclamation costs. <br />Report submitted October 12, 1999. <br />~~~~ <br />Donald G. Po y <br />Popejoy Construction Co., [nc. <br />