Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />September 18,1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />September 1/3///~(~~~-/m\1September 19, 1998 <br />Dear Mr. Dillie: V/,(;/~ <br />RECEIVED <br />SEP 2 1 1998 <br />DIV. OF MINERALS <br />8 GEOLOGY <br />San Luis Project <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of September <br />13 - September 19,1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.075 <br />ppm CN-total. The collection pond averaged 0.017 ppm CN-wad and 0.049 <br />ppm CN-total. <br />Sincerely, <br />R~~ rt~ ~~ <br />cc: Bill Lyle <br />Dan Robertson <br />