My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42094
DRMS
>
Back File Migration
>
Report
>
REP42094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:54 AM
Creation date
11/27/2007 9:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
2/23/1995
Doc Name
1994 ARR EXHIBIT 3 SEDIMENT PONDS
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT -SEDIMENT PONDS <br />DISCHARGE POINT 001 - S'I'REETER FII.L SEDIMENT POND INSPECTION DATE: - 9q <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND INSPECTION DATE:__~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? r <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND INSPECTION DATE: •/ . `f~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? rs <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND INSPECTION DATE: •99 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? fs <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND INSPECTION DATE: •/ 9 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? rs <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND INSPECTION DATE: ~/ 9/ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~~ <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND INSPECTION DATE: .,~/A•99 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? rs <br />If no, explain: <br />DISCHARGE POINT 008 -WEST PTT POND INSPECTION DATE: , •/°• 94 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? .`.i <br />If no, explain: <br />WASH BAY POND INSPECTION DATE: ,~''/~' 99 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~, <br />If no, explain: <br />TAYLOR PUMP HOLDING POND INSPECTION DATE: .!'~/jr'. 9~/ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? f5 <br />If no, explain: <br />signed: ~~.~i ~c„i Date ,/, • /~• 99 <br />Under the direction of Robert G. Trumbly, Ir., P.E. No. 16957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.