My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41984
DRMS
>
Back File Migration
>
Report
>
REP41984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:48 AM
Creation date
11/27/2007 9:10:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
12/5/1995
Doc Name
TRANSMITTAL AS BUILT DRAWING & DOCUMENTATION HENDERSON MINE SEDIMENTATION POND 1.2
From
TITAN ENVIRONMENTAL
To
HENDERSON MINE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GOODSON & ASSOCIATES, INC. <br />FILL OBSERVATION AND TESTING <br />T0. lrtan EnvlronmenLal PROJECT: Henderson Mine DATE 10 24 9~ <br />7939 East Arapahoe Road Empire. Colorado TECHNICIAN Br1an Masloff <br />_Englewood Colorado 80117 PROJECT N0: 63284 O1 SHEET 1 OF 1 <br /> <br />LAB FIELD SPEC SPEC <br />TEST <br />NO LOCATION <br /> <br /> <br />Setlimenlation pond TEST <br />TYPE DEPTH <br />OR EL <br />(FT) MAX <br />DRY <br />DENSITY <br />(pct) OMC <br />(%) DRY <br />DENSITY <br />(pct) MOIST <br />CONTENT <br />(%) COMP- <br />ACTION <br />(%) COMP <br />(%) MOIST <br />(% OF <br />OMC) SOIL TYPE <br />1 Berm north side. 120' east of west end NUC - 3 Unknown Un- <br />known 118.7 9 0 Unknown gravelly sand wdh <br />cobbles <br />2 North sitle 180 east of west entl 120 6 9 2 <br />3 Ea sl side center " " 130.3 7 2 " <br />4 South s~tle center 120 3 12 0 " <br /> <br /> <br />% TESTS INDICATE FILL MEETS SPECIFICATIONS TYPE AND NUMBER Of EARTH MOVING UNITS <br />_ FILL TESTED DOES NOi MEET SPECIFICATIONS AS INDICATED BY TYPE AND NUMBER OF COMPACTION UNITS Rubber tire loader <br />TEST NO(S) <br />ANO SHOULD BE REMOVED OR REWORKED MEi HOD OF ADDING MOISTURE Natural <br />% CONTRACTOR ADVISED FULL TIME OBSERVATION PART TIME OBSERVATION K THICKNESS OF LIFTS Unknown NUMBER OF PASSES Unknown <br />PROGRESS REPORT: the top b" of fill was frozen, the contractor informed us the frozen material would be scarified and rec ompacted prior to placing any addin onal fill material. <br />Substantial amounts of +b" cobbles (approai mately 20%) were observed in the above tested fill, thus the laboratory proctor (116.3 a[ 12.0) could be an inaccurate comparison. <br />G~n 8 Associates informed John Lopo with titan Engineering regarding the presence of +b" cobbles. We were verbally informed by John, that 6a sed on the test results Titan <br />E ering could decide if [he compaction was sa[isf actory. <br />COPIES TO <br />RE VI EIIED BY <br />This report presents oplnio ns formed as a resuU of our observations of fill placement. We have relied on the contractor to continue applying the recommended compactnre eHOrt and moisture to the fill during <br />times when our observer is not observing operations Tests are made of the fill only as believetl necessary to calibrate our observer's judgement Test data are not the sole ba sus for opinions on whether the <br />fill meets spec~fcation s. <br />(C) <br />• • • <br />
The URL can be used to link to this page
Your browser does not support the video tag.