Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />January 2003 Monthly Report <br />Page 3 <br />Table 1-January 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements (continued) <br />Monitorin Site Date De th to Water feet <br />BF-4 1/31/03 25.85 <br />BF-5R 1(31/03 31.67 <br />BF-6 1/31/03 31.69 <br />BF-7R 1/31/03 43.88 <br />BF-8 1 /31 /03 Dry <br />BF-9 1 /31 /03 42.25 <br />BF-10 1/31/03 43.90 <br />BF-11 1/31/03 44.89 <br />BF-12 1/31/03 43.09 <br />BF-13 1/3 ]/03 35.34 <br />BF-14 1/31/03 34.92 <br />DW-1 1/31/03 34.16 <br />D W-2 1 /31 /03 28.80 <br />PW-1 1 /31 /03 29.09 <br />PW_2 1/31/03 28.80 <br />pW-3 1/31/03 37.03 <br />PW-4 1/31/03 32.49 <br />PW-5 1/31/03 28.23 <br />SF-1 1/31/03 17.55 <br />SF-1 R 1 /31 /03 20.25 <br />SF-2 1 /31 /03 25.95 <br />SF-3 1 /31 /03 43.77 <br />SF-4 1/31/03 26.70 <br />SF-5 1/31/03 33.35 <br />p(;_2 1/31/03 40.10 <br />D8724 1/31/03 60.35 <br />LS-1 1/30/03 D <br />LS-2 1/30/03 Dry <br />LS-3 1/30/03 Dry <br />LD-1 1/30/03 Dr <br />LD-2 1/30/03 Dr <br />LD-3 1 /30/03 Dr <br />