Laserfiche WebLink
March 8, 2006 <br />For: File <br />Re: Colowyo Coal Company L.P. (C-81-019) <br />West Pit Fill Inspection Report and Certification <br />First Quarter, 2006 <br />West Pit Fill Construction Report <br />During the quarter beginning January 2006 and ending March 2006, I inspected the area in <br />which the West Pit Excess Spoil Fill is being constructed. The purpose of these inspections was <br />to inspect the fill surface for vegetative efforts, inspect the fill for areas of water seepage or <br />surface drainage, and satisfy the requirements of CMDG Rule 4.09.1 (11 a). <br />During the quarter, no progress was made on the West Pit Fill. No overburden was hauled to <br />backfill in the West Pit due to spoil room constraints. No sloping to final grade occurred. No <br />reclamation seeding was done during the quarter. No seepage was evident in the surface drain <br />or underdrain during the quarter. <br />Attached to this report is my certification that all construction requirements have been met thus <br />far in constructing the West Pit Excess Fill. <br />Tom Peterson <br />Vice-President <br />xc: Mr. Kurtis Blunt, Colowyo Coal Company <br />