Laserfiche WebLink
Colorado Division of Minerals end Geology <br />ESTIMATING FORM - SCRAPER YORK <br />TASK N0. 6 PREP. BY: TDG PERMIT N0. M-94-115 <br />DATE 08/19/97 FILENAME: M115-6 NINE: Orion Pit <br />PERMIT ACTION New 112c application <br />TASK DESCRIPTION Replace stockpiled topsoil over pit area <br />HOURLY EQUIPMENT COSTS: <br />______________________ Single, Double or Triple <br />County: MONTEZUMA Labor Zone 1 Shifts f <br />Equipnw•nt Descriptions <br />Scraper team make-up CA7 623E with BOPS cab <br />Road maim. - Grader N/A <br />- Hater T.: N/A <br />Scraper Team <br />Scraper Oozer(s) <br />Equi Anent Fileneme:623E•ROP <br />Utilization on job: 100X N/A <br />Cost Breakdown: <br />______________ <br />Ownership cost/hr: f38.05 N/A <br />Operating cost/hr: (76.69 N/A <br />Operator Lost/hr: (23.13 N/A <br />Unit subtotals: (137.88 N/A <br />Scraper team subtotal 5275.76 <br />Total Nork Team Cost/Nr: -f275.76 <br />Road Maintenance <br />Grader Hater truck <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />Maint. subtotal N/A <br />MATERIAL QUANTITIES: <br />___________________ <br />___________________ <br />Beg. <br />Vol une: 12497 LCT <br />[u.Yd. ---------- Swell Loose <br />Volume: 12,497 LCY Factor: N/A Vol une: 12,497 LCY <br />-_______-_ -_________ _____________ <br />Source of quantity rake-off: Assvne 3.21 ec.(pit floortl-3:1 b/f slope) a 2.5'D. <br />Source of est. swell factor: NA <br />~OZV~ <br />