My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41761
DRMS
>
Back File Migration
>
Report
>
REP41761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:35 AM
Creation date
11/27/2007 9:07:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994114
IBM Index Class Name
Report
Doc Date
11/18/1997
Doc Name
ADMINISTRATIVE RECORD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - MOTOR GRADER YORK <br />Task k: 2 Prep. by: TDG Task File Name: M115-2 <br />Date: 08/19/97 Permit p:M-94-115 Mine: Orion Pit <br />_____-______ _______-- ___________________ <br />Permit Action: New 112c application. <br />Task Description: Reg rode/rip compacted facilities areas <br />HOURLY EOUI PMENi COST <br />' ~ _____________________ Basic Machine: CA7 12 SERIES G Horsepower; 135 <br />Attachment pt: N/A Shift Basis: 1/day <br />Attechmen[ d2: Mul ti-shank ripper --------- <br />Cost Breakdown: ---------------- <br />i ______»-_____ Utilization X (DDI OSU) <br />Ownership cost/hr = 515.92 N/A <br />Operating 8 overhaul cost/hr -grader = 519.08 100 <br />-ripper = 51.92 100 <br />Operator cost/hr = 523.13 N/A <br />Total egpt. unit cost/hr = 560.05 Toter fleet cost/hr: 560.03 <br />MATERIAL QUANTITIES <br />Total area to be graded: 6.00 acres <br />Source of quantity rake-off: Exhibit F - Recfametion Plan Map <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Selected grading activity/work level: Medium grading/ripping <br />Unadjusted hourly unit production: 0.61 acres/hr (Cat Handbook OSR) <br />Job Condition Correction Factors: <br />________________________________ <br />I Avg. site altitude 6700 ft. <br />Altitude edj ustment: 0.96 (Cat Handbook los) <br />Job efficiency.... 0.83 (1sh/day PI1F) <br />Net Job Correction; 0.80 <br />Adjusted hourly unit production: 0.49 acres/hr <br />Adjusted hourly fleet production: D 49 acres/hr <br />JOB COST <br />Fleet sire 1 Grader(s) Total Job Time: 12.34 Xours <br />Unit Cost :5123.548 /acre Total Job Cost: (741.29 <br />------- ----------- 0 0 2 5 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.