Laserfiche WebLink
III IIIIIIIIIIIII III <br /> <br />April O1, 1999 <br />RECEIVED <br />APR 0~ ~ggg <br />Vision o(Minerals & Geology <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />March 28, 1999 - April 03, 1999 <br />Dear Mr. Dillie:~~ <br />- San Luis Project <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of March 28, <br />1999 - April 03, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and <0.010 <br />ppm CN-total. The collection .pond averaged 0.026 ppm CN-wad and 0.037 <br />ppm CN-total. <br />Sincerely, <br />~~~ ~ -- <br />Ron Z w <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />