My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41739
DRMS
>
Back File Migration
>
Report
>
REP41739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:34 AM
Creation date
11/27/2007 9:06:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Report
Doc Date
10/9/1990
Doc Name
RECEIPT
From
MLRD
To
IDEAL COLO DIV
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • RECEIVED <br /> Notice of Intent to Continue Mining Operations 0 C T 0 g 1990 <br /> 112 Annual Report <br /> Mined Land <br /> ReC~amati <br />Permittee Name: Holnam, Inc. c/o Dundee Cement onDivision <br />Permit No: M-77-347 <br />Operation Name: Slab Canyon Quarry <br />Anniversary Date: 10/10/90 <br />Total: E350.00 (Due on your Anniversary Date <br />Please return this form with your completed Annual Report, map, and a check <br />or money order for annual fees due, payable to the Colorado Mined Land <br />Reclamation Division, 1313 Sherman Street, Room 215, Denver, Colorado 80203. <br />ANNUAL REPORT: <br />1, No additional acres were affected in 1990. There was no <br />production from the quarry in 1990, but a small stripping of <br />overburden was done in a previously disturbed area. <br />2. Since the entire quarry is active, no reclamation has been <br />begun. <br />3. Not applicable, <br />4. Not applicable. <br />K. Not applicable. <br />6, Not applicable, <br />7, Minor production is schediled for 1991 from an existing <br />production area on the north side of the quarry, No increase <br />in affected area is anticipated during the year, <br />8, The effective date of the information included in this <br />report is October 1, 1990. ATo map is submittedrrith this report <br />since no mappable changes have occurred since the previous map <br />submittal, <br />9. The Slab Canyon quarry was flown in Septe~~:ber, 1990, and new <br />topographic maps are in preparation, This updated map wi..l be <br />submitted with the 1991 Annual Report. <br /> <br />Signature Paul E, Thomsen, p,E. <br />Plant E:,Lineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.