<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />
<br />According to C.R.S. 34-32-116(3), and C.R.S. 34-325-116(3)(a), on the anniversary datz of [he permit ea~h year,
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land,
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated too cur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please at[nch such
<br />a report and map [o enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you Qrtust
<br />provide with the Annual Report the following information as required by 2 CCR 407-], 407-4, and Rules
<br />(i) the condition of the operation at the time of cessation; ~~
<br />(ii) what specific measures have been and will be implemented to comply with reclamation, perfo ante
<br />standards and Environmental Protection Plan requirements, if they are part of your approved applica[iori; a d
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable: ~
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statemedt
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.li(1)(a), provide an update
<br />statement regarding the sufficiency of the value of the financial watrartty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per [he requirements of 2 CCR 407-], 407-4, and Rules 1.15(1)(b), permits secured wlith a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarising
<br />any ci[cumstanc_ec w~ictLm~'tyaffrst_[he~degt[acy_o~the~eed.nf~rust._oLSecudty agr?eritent, . -. _
<br />and the value of the property subject to either of these instruments. The report shall also provide
<br />proof that there are no past-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured wii:h n
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in th form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the L~:tt r of
<br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in suffici t
<br />detail to fully describe the condition, value, and location of all pledged fixtures and equip~en[.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(l)(c), all monitoring information
<br />required as part of the approved permit application, to include the Environmental Protection Plan.
<br />note [hat if you are not a Designated Mining Operation, you will not have an Environmental Pane
<br />Plan as part of your approved permit.)
<br />
|