My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41571
DRMS
>
Back File Migration
>
Report
>
REP41571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:24 AM
Creation date
11/27/2007 9:03:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
12/11/2003
Doc Name
3rd Quarter 2003 Certification of Excess Spoil Fill Inspection
From
Peak Project Management LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spoil Fill #8, .lone 6, 2003 <br />Page 2 <br />COVER MATERIAL <br />Final fill configuration has been established (assuming no resumption of mining) but cover material has not <br />been placed on the excess spoil-fill Minor erosion has resulted from seasonal precipitation subsequent to <br />compaction of the out slopes and establishment of benches. However, run-off has been directed to the side <br />drains minimizing erosion on the bench faces. <br />STRUCTURAL INTEGRITY <br />The entire excess spoil fill facility was examined for signs of failure and instability such as tension cracks, <br />ground movement, springs and seeps, and standing water. No indication of potential instability was <br />observed. <br />DOCUMENTATION AND OTHER OBSERVATIONS <br />Photographs of under-drain extension, and fill placement are attached. <br />CERTIFICATION <br />Inspection was conducted by Ronald G. Thompson, a qualified professional and MSIiA certified inspector <br />of earth and rockfill embankments and impoundments; under the direction of Mr. Charles McGlothlin, a <br />registered professional engineer licensed in the State of Colorado. <br />This is to certify, to the best of my knowledge and belief, that Fill No. 8 construction and placement, as <br />noted since the previous certification and as determined during this inspection and discussions with mine <br />personnel, is in accordance with designs as proposed by CTL Thompson in their report dated April 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br />~~v '~ <br />Ronald G. Thompson <br />Inspector <br />~~ <br />~~~ _I ~~'~~_~ .. <br />Charles W. McC othli <br />Professional Gngineer <br />~i:-. <br />Inspections completed in compliance with Rule 4.09.1(1 I)(b) nmst be submincd fu the Division within hvo mceks of completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.