Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />April 2003 Monthly Report <br />Page 4 <br />Table 2 -April 2003 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water feet Total Depth <br />ft Volume of <br />Water ft <br />P6 04/30/03 Dr 72.46 0.00 <br />P7 04/30/03 Dr 92.50 0.00 <br />P8 04/30/03 96.80 97.51 0.71 <br />P9 04/30/03 71.76 72.30 0.54 <br />PIO 04/30/03 57.39 58.30 0.91 <br />P11 04/30/03 41.16 41.80 0.64 <br />P12 04/30/03 41.56 41.71 0.15 <br />P13 04/30/03 40.96 41.34 0.38 <br />P14 04/30/03 Dr 41.24 0.00 <br />P75 04/30/03 Dry 41.10 0.00 <br />During April 2003, water treatment plant sludge management was conducted. Table 3 <br />below identifies water treatment plant sludge management for calendar year 2003 to date. <br />Table 3 -Calendar Year 2003 Water Treatment Plant Sludge Management <br />Date Approximate Tonnage <br />Mana ed Sludge Disposition <br />March 12-] 5, 2003 670 Tailin Dis osal Area <br />A ril 17-18, 2003 600 Dr in Pad <br />Should you have any questions or comments, please do not hesitate to contact either Mr. <br />Julio Madrid (719) 379-0799 or myself (303) 324-2630 or (970) 325-4482. <br />S1n~er~Y~ <br />Bi~IItGL/yle / <br />Director of Env. Affairs <br />Cc: Julio Madrid <br />file <br />