My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41515
DRMS
>
Back File Migration
>
Report
>
REP41515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:21 AM
Creation date
11/27/2007 9:02:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
3/16/2006
Doc Name
2005 Annual Hydrology Report Cover Letter to Section 2.8
From
Trapper Mining Inc.
To
DMG
Annual Report Year
2005
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 SURFACE WATER <br />Trapper Mine monitored one stream site and twenty active NPDES discharge sites during <br />2005. The stream site Flume Gulch (S-1) was sampled during June 2005 sampling to characterize <br />spring flows at this location. Flow was observed at NPDES sites 001, 002, 011, 020, 021 and 023 in <br />2005. Baseline stream site East Pyeatt (S3) is also NPDES site 011. Sites were monitored weekly <br />throughout the year. Sites NPDES 005, 008, 009, 012, 013, 014, 015, 016, 017, 018, 019 and 024 did <br />not discharge dwing 2005. Maps No. 2-1 through 2-3 show the locations of these surface-water <br />sites. <br />4.1 SURFACE-WATER FLOW <br />The 2005 flow data tabulated in Appendix C in Table C-1 represents instantaneous <br />I~ <br />in 2005 at the Trapper Mine due to the precipitation being 2.4 inches of lower than average. <br />measurements associated with NPDES water-quality sampling. Surface runoff was similaz to normal <br />Figures Gl through C11 present the instantaneous flow versus time for the Trapper NPDES <br />sites for 2005. Flow occurred during the weekly samples between January 4, 2005 and June 28, <br />2005, October 11 and December 6 and the last week in December at NPDES 001. The high flow <br />during sampling was a flow of 348 gpm on January 11, 2005 which is a typical peak at this site. <br />High flows due to snowmelt at NPDES 001 and NPDES 002 during 2005 were typical of average <br />conditions (see Figure C-1). Surface flow at NPDES 011 was observed during several samplings of <br />this site in 2005 (see Figure C-2). Figure C-3 shows that very low flow from NPDES site 020 <br />occurred during 2005. Three lazger peak flows occurred from NPDES site 021 during 2005. These <br />peaks occurred during May, June and November at NPDES site 021 in 2005 {see Figure C-3). <br />Trapper Mining Company 4-1 <br />2005 Annual Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.