Laserfiche WebLink
Mining ~ • • <br />~xplorat~on <br />Engineering FaEO M. JGMtr SOev, G -6 <br />GECSOG67 <br />•O PTO <br />c~+.r.co caa+woo e:~o, <br />October 26, 198-0 <br />TOe National King Coal, Inc. <br />SUBJECT: Quarterly Inspection, Huntington Ditch, Fourth <br />Quarter, 1984. <br />rn.:. 'c:~ :.-c~'+ <br />:s~.~.:.: ~' .::r.7 <br />1) The fourth quarterly inspection of the Huntington Ditch, <br />King Coal Mine, La Plata County, Colorado was made on October <br />15, 1984. ` <br />2) The ditch was found to be in good condition. <br />An inspection was made of the Huntington Ditch on October <br />15, 1984. Other than normal weed and native plant growth, the <br />ditch was found to be in satisfactory condition. The ditch was <br />inspected for evidence of leakage, damage due to erosion or <br />other damage which might be caused by the effects,of under- <br />ground mining. The purpose of the inspection was to meet re- <br />quirements established by the Colorado Mined Land Reclamation <br />Division for. quarterly inspection of the Huntington Ditch. <br /> <br />_. .~ ... <br />~2d M. Jo son, C.P.G. <br />FMJ/tj <br />