Laserfiche WebLink
<br /> <br /> <br />_~ <br />P.O. !o~ i~7 <br />PounlNn, CO <br />lG17 <br />~~ <br />., <br />' ptll <br />71aou•ww <br />Por All <br />Your l.nely NMdrl <br />MINING PLAN FOR RECENTLY PERMITTED SOUTH PARCEL: <br />Mining activities will occur on the 21.90 acres as a clean up and <br />reclamation phase to finish Chat portion previously mined by passed <br />owners. Also mining will begin on that portion of land approved by <br />the Board of County Commissioners on May 17, 1990. Mining will <br />begin on the central North side and Northwesterly portion, and proceed <br />South, West and East leaving that portion fronting Interstate 25 <br />undisturbed until the lest phase of mining end reclamation. <br />The mining operation to be conducted will be a surface sand and gravel <br />extraction operation. The operation will conslat of stripping and stock <br />piling top soil; removing the sand and gravel; leveling the mined areas <br />end re-vegetating in accordance with the enclosed reclamation plan. <br />Access to the proposed wren will be provided by existing haul roads <br />already located withln Midway Sond & Gravel, Inc. The haul roads will <br />be extehded as needed to the Qreas being mined. The haul roads will be <br />properly maintained by Midway Sand & Gravel, Inc. during the life of thl <br />operation. The haul distance from the mining site to the scale is <br />approximately 3/4 to 1} miles. <br />To alleviate any dust problems on the access roads, truck speeds will b <br />kept under fifteen miles per hour. All road surfaces are graveled. We <br />will use a water truck with a spray bar to control any dust problem, in <br />accordance with our existing mining plan. <br />The mining equipment to De used is all portable, and will not require <br />any public services such as water, electricity, or gas. <br />All corners of said property are marked with a steel stake and ribbon. <br />\ _ <br />~ --- -- <br />